Soma · Paid pilot
From design evaluation to operating-evaluation workpapers
Draft design-evaluation workpapers from an RCM. Controls with a Pass design conclusion can continue to operating evaluation with samples and evidence.
Sign-in and access rights are required. Confirm the scope before starting a pilot.
Materials needed to begin
- An RCM and an existing design-evaluation workpaper, if available
- Evaluation procedures and sampling design
- PDF or image evidence for the samples
We review the material you already have before agreeing on the pilot scope.
Pilot deliverables
- Design-evaluation workpaper
Record the control description, evaluation procedures, and reviewed conclusion.
- Operating-evaluation workpaper
Connect samples and evidence with the procedures performed and results checked.
- Exceptions and review points
Record items needing attention and the reviewer's edits or deferred decisions.
Workflow
- 01
Draft the design evaluation
Prepare a draft workpaper with the selected control's description and evaluation.
- 02
Review the design conclusion
The reviewer checks the evidence and conclusion. Only controls with a Pass conclusion continue to operating evaluation.
- 03
Draft the operating evaluation
Link the sampling design and evidence, then record the results and exceptions.
- 04
Review and save
Check the evidence and completeness before saving the XLSX workpaper.
What requires human approval
The responsible reviewer determines design and operating effectiveness and the final conclusion. Verify the workpaper's evidence and completeness before review and sign-off.
Example results
Operating-effectiveness workpaper draft
- Design conclusion
- PassContinue to operating evaluation
- Samples and evidence
- Check the selected samples and evidenceFor review
- exception
- Items needing further explanationReviewer check
- Final conclusion
- Waiting for the decision of the person in chargeNot finalized
Illustrative example. Actual fields and outputs depend on the selected workflow and supported format.